ACMV

3.1 Air Conditioning System
3.1.1 Chillers Setup
3.1.2 Cooling Towers Setup
3.1.3 Chilled Water Pumps Setup
3.1.4 Condenser Water Pumps Setup
3.1.5 AHU / MAU / FCU Setup
3.2 Control System
3.2.1 Control Panel & wiring to System
3.2.2 Control Valves & Dampers Setup
3.2.3 Troubleshoot & Maintenance
3.3 Ducting / Piping Works
3.3.1 Ductwork Installation
3.3.2 Sizing & Dimension
3.3.3 Piping Installation
3.3.4 Drainage System
3.3.5 Hydronic System Balancing
3.3.6 Air Balancing
3.4 Accessories
3.4.1 Vibration Isolation Springs Installation
3.4.2 Inertia Block Installation
3.4.3 Hoisting and Shifting to sites
3.5 Electrical Works
3.5.1 Electrical Supply to Equipment