Hoisting / Installation

7.1 Hoisting Preliminary

7.1.1 Loading Calculation
7.1.2 Shifting Pave Study
7.1.3 Crane Size Proposal
7.1.4 Shifting Procedures Submission

 

7.2 Hoisting Activities

7.2.1 Safety Check on Site
7.2.2 Lifting Equipment Inspection
7.2.3 Lifting Personnel Inspection
7.2.4 Equipment Preparation
7.2.5 Hoist Through Proper Signalman

 

7.3 Shifting Activities

7.3.1 Site Preparation Works
7.3.2 Shifting with Proper Tools

 

7.4 Equipment Installation

7.4.1 Mark-out Placement Location
7.4.2 Orientation Check
7.4.3 Isolation Installation
7.4.4 Piping Installation
7.4.5 Electrical Installation
7.4.6 Control Installation