Industrial Process / Mechanical

  • Chilled Water System
  • Process Cooling System
  • Process Vacuum
  • Dust Collection System
  • Exhaust System
  • De-Ionized Water System
  • Chemical Waste Collection System

1.1 Infrastructure Equipment Setup

1.1.1 Pumps
1.1.2 Inertia Blocks
1.1.3 Vacuum System
1.1.4 Dust Collector System
1.1.5 Control Equipment Setup

 

1.2 Builders & Construction Works

1.2.1 Equipment Installation Work
1.2.2 Piping Installation Work
1.2.3 Site Coordination
1.2.4 Safety Coordination

 

1.3 Documents Submission

1.3.1 Work Statement / Procedures
1.3.2 Risk Assessment
1.3.3 Materials Catalogue / Specification
1.3.4 Drawings – Shop / Construction / As-Built
1.3.5 Schedules