Industrial Process / Mechanical

- Chilled Water System
- Process Cooling System
- Process Vacuum
- Dust Collection System
- Exhaust System
- De-Ionized Water System
- Chemical Waste Collection System

1.1 Infrastructure Equipment Setup
1.1.1 Pumps
1.1.2 Inertia Blocks
1.1.3 Vacuum System
1.1.4 Dust Collector System
1.1.5 Control Equipment Setup
1.2 Builders & Construction Works
1.2.1 Equipment Installation Work
1.2.2 Piping Installation Work
1.2.3 Site Coordination
1.2.4 Safety Coordination
1.3 Documents Submission
1.3.1 Work Statement / Procedures
1.3.2 Risk Assessment
1.3.3 Materials Catalogue / Specification
1.3.4 Drawings – Shop / Construction / As-Built
1.3.5 Schedules